An engineering consultancy's ERP, redesigned around the two things it does all day: estimate and review.

ClientMuscat Engineering Consultancy
ProductMEC ERP
Where and whenOman · 2023 to 2025
PlatformWeb app
The screen, annotated by hand · scroll
Estimations by project: status, norms override, approval and FRR columns
  1. every ID opens the estimatethe list is the way in; nothing is more than one click from here
  2. copy, print, Excelestimators take numbers out every day, so export sits at eye level, not in a menu
  3. three statuses, side by sideestimate, norms override and FRR move separately, so each gets its own column

The story, in the order I work

Given · why

What was there

MEC runs multi-discipline engineering projects for oil, gas and infrastructure clients. The redesign covered Estimations (cost-time-resource records per project and discipline, norms overrides, approval and FRR status) and Document Management (drawings and reports moving through squad, inter-discipline and client checks, by revision and cycle). Dense tables, bulk actions, column visibility and exports were designed for people who live in the system eight hours a day.

Planted · what I owned

What I took on

  • User journey mapping with estimators, discipline leads and document controllers
  • Information architecture for Estimations, document management (DDM / EDMS) and the client portal
  • Table system: filters, column visibility, bulk edit, copy, print, Excel export
  • Approval and review workflows: squad, inter-discipline and client checks, by revision and cycle
  • Four design revisions (R1 to R4) against user feedback
  • Led a team of five to six, two or three of them on design, for the length of the engagement
Shipped

What went out

Released through 2025 as a web app.

Estimations · Projects Discipline estimates Norms & approvals Document control (SDC / DQC / IDC) Revisions & cycles Issue instructions Client portal Progress statistics Overtime requests Contracts · companies · contacts Reports

Yields

2Fewer clicks per intent, on average, after the redesign
5Modules: estimations, documents, client portal, overtime, contracts
4Design rounds with the people who use it, R1 to R4
What I'd do differently

The honest paragraph.

The requirements came in waves, not all at once. We agreed a scope, another wave arrived, and the agreed scope moved with it. Four design rounds is the visible cost of that. What I would do differently is hold the line harder: agree what is in this round, write it down, and make the next wave a new round with its own date, instead of letting it dissolve into the current one.

Scope agreed is not scope held. Write it down, and give the next wave its own date.
field note